SHED 2
Ribbon Blender for Powder Mixing
NFIC-KUP-U03-04
Machine at a glance
Unit
Unit 3 — Masala & Spice Processing
Shed / location
SHED 2
Zone
Mixing & Blending
Actual capacity / range
Minimum 30 Kg per batch with blending cycle approximately 20 minutes
Actual power
Maximum 1 HP, 3 Phase
What this machine helps make
Nalla karam / Andhra dry karam powder
High DemandMain raw material: Chilli + garlic/spices
View product →Curry leaf podi
High DemandMain raw material: Curry leaf + spices
View product →Ready mix: Dosa
High DemandMain raw material: Formulation-specific / mixed ingredients
View product →Ready Mix: Jamun
High DemandMain raw material: Fruit / formulation-specific
View product →Gongura dry podi
High DemandMain raw material: Gongura / red sorrel
View product →Pesarattu dry premix
High DemandMain raw material: Green gram + rice
View product →Masala roasted groundnuts
High DemandMain raw material: Groundnut
View product →Palli podi / groundnut chutney powder
High DemandMain raw material: Groundnut
View product →Salted roasted groundnuts
High DemandMain raw material: Groundnut
View product →Ulava podi / roasted horse-gram powder
High DemandMain raw material: Horse gram / Ulavalu
View product →Millet dosa/idli dry premix
High DemandMain raw material: Millets + pulses/rice
View product →Gluten-free millet bread premix
High DemandMain raw material: Millets / multi-millet
View product →Andhra curry / pulusu masala powder
Medium DemandMain raw material: Mixed Andhra spices
View product →Multi-millet flour
High DemandMain raw material: Mixed millets
View product →Multi-millet health mix
High DemandMain raw material: Mixed millets + pulses
View product →Sambar powder
High DemandMain raw material: Mixed spices
View product →Biryani / garam masala
Medium DemandMain raw material: Mixed spices
View product →Rasam powder
Medium DemandMain raw material: Mixed spices
View product →Ready-to-cook multigrain whole mix for drink/porridge
High DemandMain raw material: Multigrain / cereal-legume
View product →Dhal-based nutritional supplement
High DemandMain raw material: Pulses / dhal
View product →Ready mix: Vada
High DemandMain raw material: Pulses / dhal
View product →Ragi java / ragi health-drink dry mix
High DemandMain raw material: Ragi + dry ingredients
View product →Idli karam / gunpowder
High DemandMain raw material: Red chilli + pulses/spices
View product →Kandi podi
High DemandMain raw material: Red gram / Tur
View product →Instant idli/dosa dry premix
High DemandMain raw material: Rice + black gram
View product →Rice-millet multigrain flour blend
Medium DemandMain raw material: Rice + millets
View product →Operating SOP
1. Pre-operation checklist
• SS304 mixing chamber completely clean — full internal wipe required
• Discharge valve CLOSED before loading
• All ingredients pre-weighed to CFTRI formula — deviation above ±2% affects quality
• Discharge valve CLOSED before loading
• All ingredients pre-weighed to CFTRI formula — deviation above ±2% affects quality
2. Start-up procedure
1. Load all ingredients through top opening
2. Close top cover securely
2. Close top cover securely
3. Operating steps / parameters
1. Load all ingredients through top opening
2. Close top cover securely
3. Switch on — blend 15–20 minutes
4. DO NOT open during blending
5. After 20 min — stop — check blend uniformity from 3 sample points
6. Not uniform? Blend 5 more minutes
7. Open discharge valve — collect into clean container
2. Close top cover securely
3. Switch on — blend 15–20 minutes
4. DO NOT open during blending
5. After 20 min — stop — check blend uniformity from 3 sample points
6. Not uniform? Blend 5 more minutes
7. Open discharge valve — collect into clean container
4. Shutdown procedure
5. After 20 min — stop — check blend uniformity from 3 sample points
5. Cleaning / sanitation
• Full internal clean — all ribbon surfaces wiped
• Product changeover — any trace of previous product is contamination
• Log: products blended | CFTRI formula reference | batch weight | blend uniformity result
• Product changeover — any trace of previous product is contamination
• Log: products blended | CFTRI formula reference | batch weight | blend uniformity result
6. Safety / PPE
• DO NOT open top cover while ribbon is rotating — HIGH SPEED
• Discharge valve must be CONFIRMED CLOSED before loading
• Discharge valve must be CONFIRMED CLOSED before loading
7. Troubleshooting
Ribbon showing coating buildup (hygiene risk) | Drive belt slipping (tension adjustment) — call supervisor
8. Preventive maintenance
Routine prevention is embedded in the pre-operation and post-operation checks; no separate time-based preventive-maintenance interval is stated on the source card.