SHED 2

Double Drum Roaster Electric

NFIC-KUP-U03-03

Machine at a glance

Unit
Unit 3 — Masala & Spice Processing
Shed / location
SHED 2
Manufacturer
Suga Agro Tech
Actual capacity / range
Minimum 25 Kg per batch with roasting cycle approximately 20 minutes under standard operating conditions
Actual power
Maximum 1 HP, 3 Phase

What this machine helps make

Chikki / Nutra chikki (3 formulations)
Very High Demand
Use / Function in this Product: Drum roaster
Foods for diabetics
Very High Demand
Use / Function in this Product: Continuous vibro-fluidised bed dryer
Groundnut (peanut) butter
Very High Demand
Use / Function in this Product: Roaster
Low fat expanded green snack using moringa
Very High Demand
Use / Function in this Product: Toasting unit; Roasting unit
Jowar cereal flakes
High Demand
Use / Function in this Product: Roaster
Low-GI beverage for diabetics
High Demand
Use / Function in this Product: Roaster
Millet & multi millet instant upma mix
High Demand
Use / Function in this Product: Roaster cum blender
Multigrain cereal-legume bar & puffed rice bar
High Demand
Use / Function in this Product: Drum Roaster
Ready-to-cook multigrain whole mix for drink/porridge
High Demand
Use / Function in this Product: VFB roaster/ bowl roaster
Roasted & flavoured cashew kernels
High Demand
Use / Function in this Product: Drum Roaster/Coating pan
Coffee concentrate
Medium Demand
Use / Function in this Product: Coffee roaster
Low-GI noodles
Medium Demand
Use / Function in this Product: Toaster
Millet & multi millet instant ravva idli mix
Medium Demand
Use / Function in this Product: Roaster cum blender
Multigrain-based fortified snack
Medium Demand
Use / Function in this Product: Vibro fluid bed roaster
Nutra chikki with added spirulina
Medium Demand
Use / Function in this Product: Drum Roaster
Protein/vitamin/mineral fortified chikki
Medium Demand
Use / Function in this Product: Drum roaster
Ready-to-eat low-fat maize snacks
Medium Demand
Use / Function in this Product: Toaster
Spice mix: Puliyogare
Medium Demand
Use / Function in this Product: Bowl roaster
Spirulina choco bar and cereal bar
Medium Demand
Use / Function in this Product: Drum Roaster
Energy food - new formulation
Low Demand
Use / Function in this Product: Fluidized bed roaster; gram toaster
Instant traditional Rasam
Low Demand
Use / Function in this Product: Bowl roaster
Instant traditional Sambar
Low Demand
Use / Function in this Product: Bowl roaster
Processing of cocoa beans to: Cocoa mass, Cocoa butter, Cocoa powder
Low Demand
Use / Function in this Product: Roaster
Ready mix: Idli
Low Demand
Use / Function in this Product: Drum Roaster
Sesame based nutritional supplement
Low Demand
Use / Function in this Product: Roasting machine

Operating SOP

1. Pre-operation checklist

• SS304 drum completely clean from previous batch
• Temperature probe checked — reads ambient before starting
• Drum rotation — rotate manually 2 turns to check free movement
• Pre-heat: switch on heating 5 min before loading

2. Start-up procedure

1. Pre-heat to target temperature
2. Load product — MAXIMUM 25 kg — do not exceed

3. Operating steps / parameters

1. Pre-heat to target temperature
2. Load product — MAXIMUM 25 kg — do not exceed
3. Start drum rotation
4. Monitor temperature continuously — DO NOT leave unattended
5. Spices: 140–160°C / 10–12 min | Groundnut: 160°C / 12–15 min | Millets: 130–140°C / 10 min
6. Maximum 25 minutes per batch — beyond this, burning risk
7. Discharge into clean tray — spread to cool — do not pile hot product
8. Allow drum to cool before next batch

4. Shutdown procedure

8. Allow drum to cool before next batch

5. Cleaning / sanitation

• Brush drum clean when COOL
• Wipe heating element housing
• Log: product roasted | temperature | time | batch weight | any burn observation

6. Safety / PPE

• DRUM SURFACE REACHES 200°C — HEATPROOF GLOVES MANDATORY for discharge
• Never leave running unattended
• Keep water away from heating element

7. Troubleshooting

Temperature not reaching set point (heating element issue) | Drum rotation irregular (motor service needed) — call supervisor

8. Preventive maintenance

Routine prevention is embedded in the pre-operation and post-operation checks; no separate time-based preventive-maintenance interval is stated on the source card.