SHED 1
Millet Destoner
NFIC-KUP-U09-01
Machine at a glance
Unit
Unit 9 — Millet Processing (Pre-existing)
Shed / location
SHED 1
Zone
Raw Material Cleaning & Prep
What this machine helps make
Sajja flour
Medium DemandMain raw material: Bajra / pearl millet / Sajja
View product →Ready mix: Dosa
High DemandMain raw material: Formulation-specific / mixed ingredients
View product →Ready Mix: Jamun
High DemandMain raw material: Fruit / formulation-specific
View product →Jowar flour
High DemandMain raw material: Jowar / sorghum
View product →Korra flour
High DemandMain raw material: Korra / foxtail millet
View product →Sama flour
Medium DemandMain raw material: Little millet / Sama
View product →Millet dosa/idli dry premix
High DemandMain raw material: Millets + pulses/rice
View product →Gluten-free millet bread premix
High DemandMain raw material: Millets / multi-millet
View product →Multi-millet flour
High DemandMain raw material: Mixed millets
View product →Multi-millet health mix
High DemandMain raw material: Mixed millets + pulses
View product →Ready-to-cook multigrain whole mix for drink/porridge
High DemandMain raw material: Multigrain / cereal-legume
View product →Dhal-based nutritional supplement
High DemandMain raw material: Pulses / dhal
View product →Ready mix: Vada
High DemandMain raw material: Pulses / dhal
View product →Ragi flour
High DemandMain raw material: Ragi / finger millet
View product →Rice-millet multigrain flour blend
Medium DemandMain raw material: Rice + millets
View product →Operating SOP
1. Pre-operation checklist
• Empty stone trap completely
• Check blower outlet — not blocked
• Verify power connection
• Machine on floor mats — stable
• Check blower outlet — not blocked
• Verify power connection
• Machine on floor mats — stable
2. Start-up procedure
1. Switch on BLOWER first — wait 30 seconds
2. Load grain into hopper — max 80% capacity
2. Load grain into hopper — max 80% capacity
3. Operating steps / parameters
1. Switch on BLOWER first — wait 30 seconds
2. Load grain into hopper — max 80% capacity
3. Feed at rated 80 kg/hr — do not rush
4. Empty stone trap when 70% full
5. Hand-check output sample every 30 min for stones
6. Run blower empty 2 min after batch
2. Load grain into hopper — max 80% capacity
3. Feed at rated 80 kg/hr — do not rush
4. Empty stone trap when 70% full
5. Hand-check output sample every 30 min for stones
6. Run blower empty 2 min after batch
4. Shutdown procedure
6. Run blower empty 2 min after batch
5. Cleaning / sanitation
• Empty stone trap completely
• Brush hopper and outlet
• Log: grain type | weight in | weight out | stones removed | any observation
• Brush hopper and outlet
• Log: grain type | weight in | weight out | stones removed | any observation
6. Safety / PPE
• DUST MASK mandatory
• Never put hand into hopper while running
• Keep feet clear of stone trap outlet
• Never put hand into hopper while running
• Keep feet clear of stone trap outlet
7. Troubleshooting
Call supervisor if vibration increases, blower flow drops, or stones visible in output
8. Preventive maintenance
Routine prevention is embedded in the pre-operation and post-operation checks; no separate time-based preventive-maintenance interval is stated on the source card.