SHED 2

Millet Cookie Mixing Machine

NFIC-KUP-U09-04

Machine at a glance

Unit
Unit 9 — Millet Processing (Pre-existing)
Shed / location
SHED 2
Manufacturer
Suga Agro Tech

What this machine helps make

Multigrain bread
Very High Demand
Use / Function in this Product: Dough mixer
Ragi-based papads
Very High Demand
Use / Function in this Product: Motorized mixing; forming and kneading machine
Shelf-stable roti from non-wheat cereals & millets
Very High Demand
Use / Function in this Product: Motorized mixing; kneading machine
Multigrain pizza base
High Demand
Use / Function in this Product: Dough mixer
Pulse-based papads
High Demand
Use / Function in this Product: Motorized mixing; forming and kneading machine
Gluten-free millet bread premix
Medium Demand
Use / Function in this Product: Dough mixer/homogenizers
A process for the preparation of Spice Bread
Low Demand
Use / Function in this Product: Dough mixer
Gluten free biscuit
Low Demand
Use / Function in this Product: Dough mixer

Operating SOP

1. Pre-operation checklist

• Bowl completely clean and dry — no residue
• All ingredients weighed before switching on
• Correct mixing attachment fitted
• Speed set to LOW before loading

2. Start-up procedure

1. Load DRY ingredients first (flour, sugar, baking powder, salt)
2. Mix at LOW speed 1 minute

3. Operating steps / parameters

1. Load DRY ingredients first (flour, sugar, baking powder, salt)
2. Mix at LOW speed 1 minute
3. Add fat (butter/oil) gradually while mixing
4. Increase to MEDIUM speed
5. Mix 3–5 minutes until uniform dough
6. Switch off — remove dough immediately

4. Shutdown procedure

6. Switch off — remove dough immediately

5. Cleaning / sanitation

• Remove all dough from bowl immediately
• Wash bowl with warm water — NO harsh chemical cleaners
• Dry completely before next use
• Log: recipe batch | weight of dough produced

6. Safety / PPE

• Never reach into bowl while running
• Do not exceed rated batch size
• Keep on stable surface — vibration can cause tipping

7. Troubleshooting

Mixing not uniform after 5 min, unusual motor sound, bowl not locking — call supervisor

8. Preventive maintenance

Routine prevention is embedded in the pre-operation and post-operation checks; no separate time-based preventive-maintenance interval is stated on the source card.